PCA Corporate HQ

PCA Corporate HQ
LOCATION Lake Forest, IL
DEVELOPER Packaging Corporation of America (PCA)
SIZE 109,000 SF
SERVICES Code Commissioning, Mission Critical Commissioning

Packaging Corporation of America (PCA) moved their corporate headquarters from a nearby office building to the former Brunswick Corporation building at 1 North Field Court in Lake Forest, Illinois in 2019. The building was gutted and rehabbed with modern furnishings and a data center. In the rehab project, many of the existing HVAC systems were replaced with new equipment. PCA had specific requirements for performance of the mission critical data systems and Cyclone designed, coordinated and tested the system to demonstrate to the owner the emergency power system had the capability and performance to respond to a complete power outage. This included an integrated systems test (often referred to as a “black-out test”) which required Cyclone to schedule and coordinate multiple contractors for demonstration testing. Cyclone provided additional support to the project by commissioning all of the building HVAC, lighting and plumbing systems.

 

PCA Corporate HQ

PCA Corporate HQ

Mary O'Donoghue Andujar

Packaging Corporation of America (PCA) moved their corporate headquarters from a nearby office building to the former Brunswick Corporation building at 1 North Field Court in Lake Forest, Illinois in 2019. The building was gutted and rehabbed with modern furnishings and a data center. In the rehab project, many of the existing HVAC systems were replaced with new equipment. PCA had specific requirements for performance of the mission critical data systems and Cyclone designed, coordinated and tested the system to demonstrate to the owner the emergency power system had the capability and performance to respond to a complete power outage. This included an integrated systems test (often referred to as a “black-out test”) which required Cyclone to schedule and coordinate multiple contractors for demonstration testing. Cyclone provided additional support to the project by commissioning all of the building HVAC, lighting and plumbing systems.

 

Related Posts

Screen Shot 2020-05-20 at 3.58.21 PM

William Blair – Chicago

Whitney Young Library

Whitney Young Library Expansion

Warren Park PK-6 Elementary School

Warren Park Elementary School

  • About Us
  • Our Solutions
  • Our Work
  • Our Team
  • Our Values
  • Our Culture
  • Our News
  • Our Blog
  • Our Videos
  • Contact Us
  • Careers

Subscribe to our blog:

© 2019 Cyclone Energy Group
cyclone-energy-group-logo

Get The Latest News! 

Subscribe To Our Newsletter Below

Subscribe - News
cyclone-energy-group-logo

Stay Up To Date! 

Subscribe To Our Blog Below

Subscribe - Blog